A version of the following article appeared in the November 6, 2026, edition of The Charlotte Ledger, an e-newsletter with local news and insights for Charlotte, N.C.

Need to subscribe — or upgrade your Ledger e-newsletter subscription? Details here.

Duke Energy: Big power needs from data centers will begin hitting the grid next year

by Ashley Fahey

In its third-quarter earnings call on Thursday, leaders at Charlotte-based Duke Energy say 5.2 gigawatts of power for data centers that are under construction now will begin using energy in the second half of 2027 and 2028.

How much is 5.2 gigawatts, exactly? It could power about 4.2 million homes for one year and is more than four times what was required to operate the DeLorean time machine in “Back to the Future.”

logo

Subscribe to The Charlotte Ledger's paid version to read the rest.

Become a paying member of The Charlotte Ledger to gain access to this post and other subscriber-only articles. (Paying Ledger members: Log in under "sign in" at the top of this page — no password required)

Upgrade

A subscription gets you:

Reply

Avatar

or to participate